Operative cohort
Section 1(2), section 2, sections 18–26, sections 35 and 38–43, plus section 44(1) and 44(3).
Rules 1, 2 and 17–21.
Show calculation basis
G.S.R. 843(E), clause (a); G.S.R. 846(E), rule 1(2).
Awaiting first ingestion · network path absent
Inspect the gateReading desk
Current page only · never savedNormal reading
A calmer measure for this page. Full navigation resets it.
Normal reading.
OFFICIAL DESK / GAZETTE FIRST
Start with the Act and Gazette notifications. Official explainers help with context, but provision-level commencement must be traced to the controlling text.
LEGAL STATUS BOARD / PROVISION SPECIFIC
Read the operative cohort separately from two later dates already fixed by Gazette notification. This is a map to the record, not a compliance answer.
Section 1(2), section 2, sections 18–26, sections 35 and 38–43, plus section 44(1) and 44(3).
Rules 1, 2 and 17–21.
G.S.R. 843(E), clause (a); G.S.R. 846(E), rule 1(2).
Section 6(9) and section 27(1)(d).
Rule 4.
One year after Gazette publication under G.S.R. 843(E)(b) and rule 1(3).
Sections 3–5; section 6(1)–(8) and 6(10); sections 7–17; section 27 except 27(1)(d); sections 28–34, 36, 37 and section 44(2).
Rules 3, 5–16, 22 and 23.
Eighteen months after Gazette publication under G.S.R. 843(E)(c) and rule 1(4).
RULE STATUS NAVIGATOR / 01–23
Select a Rule to see its notified commencement date and exact Gazette pinpoint. This matrix maps timing only; it does not decide applicability or explain the Rule's substance.
Use Tab to enter the matrix; arrow keys move between visible Rules. Home and End move to the first and last visible Rule.
PRIMARY RECORD SET
Each profile records the publisher, identifier, legal-status note, effective-date basis, pinpoint, checked date and update trail.
Primary legislation · Act No. 22 of 2023
The enacted statute. Section 1(2) expressly allows different dates for different provisions.
Commencement notification · G.S.R. 843(E)
The controlling notification for which Act provisions are in force now and which commence in later tranches.
Final Rules · G.S.R. 846(E)
The final Rules. Their notification did not make every rule operative on the same day.
Corrigendum · G.S.R. 892(E)
The official correction record associated with the final Rules. The MeitY source register also lists it on 16 December 2025.
EDITORIAL BOUNDARY
A notified future provision is not labelled “in force.” An official press release is not substituted for Gazette text. A technical control, checklist or article is not treated as proof or certification of legal compliance.
This record is educational and may not capture every later notification. Check the linked official documents and obtain qualified advice for a real decision.